We have successfully installed two 10KW capacity Wind-Solar Hybrid Power plants to electrify two remote areas in Nagaland. The work by the Spitzen Energy team was exemplary and the systems are found to be very useful which provide power to the most needy areas and reduce the carbon footprint.